The Goulburn Post reports this week that the Goulburn Mulwaree Council planned to call for expressions of interest before Christmas for feasibility studies into both solar and bio-gas generation projects on council land and assets, including its water stores.
The council – which last financial year spent $1.55 million on electricity, much of it to power water and sewer infrastructure and street lights – is also working to cut its greenhouse gas emission by 30 per cent by 2020 based on 2005/06 levels, as part of its sustainability action plan.
Council has already installed solar panels on several council buildings, the paper said, and at its most recent meeting, agreed to install a 45kW system at a government storage depot.
Bio-gas generation is planned for the new $30 million wastewater treatment plant, which currently under construction.
In terms of floating solar, Council general manager Warwick Bennett said the council would start with the Marulan water treatment plant, due to its storage dam being comparatively close to the water treatment plant.
Bennett said the council was also looking at installing a solar farm on spare land surrounding the wastewater treatment plant, that would be freed up after the plant becomes operational.
“It (the plant) will be a much larger user of electricity and we are looking at solar to offset that. There is opportunity for a 700 to 800 acre solar farm there,” he said.
The idea of installation solar and wind farms at, or on, council-owned dams and water treatment facilities has been gaining popularity around the country, particularly among local government groups who often own the energy hungry utilities.
In April this year, Queensland’s Gold Coast Council proposed the installation of a series of floating solar PV arrays on its network of wastewater ponds both to help power the city’s wastewater treatment plants – cutting council operating costs – while also cutting evaporation from the ponds.
And in South Australia, the state’s largest water and sewerage services supplier, SA Water Corporation, announced plans to commission a commercial-scale solar and storage system at its Crystal Brook Workshop site.
In a Request for Tender launched in July, the company – which manages more than 27,000km of water mains, including 9,266 km in the Adelaide metropolitan area – said it was seeking to build a grid-connected, rooftop solar PV system of more than 100kW, along with a 50kWh battery storage system and “smart controls,” to manage periods of high electricity prices and ensure safe and sustainable delivery of water to customers.
Meanwhile, in Goulburn, plans are also underway to develop a 1MW community-owned solar farm, led by Community Energy 4 Goulburn in collaboration with local business Divall’s Haulage – owner of the land the solar farm is slated to be built – and Infigen Energy.
Sophie is editor of One Step Off The Grid and deputy editor of its sister site, Renew Economy. Sophie has been writing about clean energy for more than a decade.
This post was published on September 26, 2017 2:36 pm
Clean Energy Council gets off to less than ideal start to its "new and improved"…
Victoria makes good on its promise to add electric induction stoves to energy upgrades incentive…
Impressive growth from one state in particular has set the rooftop solar market back on…
Rosemary Grundy is on a mission to demonstrate that going renewable and electric is not…
Clean Energy Council retains the job of managing the list of products that can participate…
Five months after it was first announced, NSW launches its home battery incentive, offering up…
View Comments
Bio-gas as a power source, why isn't this part of every sewage treatment works..
Yes-agree 100% .At tips and sewage works there are massive fugitive methane emissions problems unaddressed- and methane is 40 times more potent as a GHG than CO2