• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
One Step Off The Grid

One Step Off The Grid

Solar, storage and distributed energy news

  • Solar
  • Battery/Storage
  • Off-Grid
  • Efficiency
  • Software
  • Podcasts
  • Tariffs
  • Electric Vehicles
  • Electrification

Community battery plan kicks off journey to 100 pct renewables for Phillip Island

October 21, 2021 by Joshua S Hill Leave a Comment

Image: Flickr, Larry Koester

Australian network company AusNet Services has teamed up with its renewable energy-focused offshoot, Mondo Power, to develop the first community-scale battery energy storage system on Phillip Island, a Victorian Bass Coast community’s first major step to sourcing 100 per cent renewables.

The Phillip Island Community Energy Storage System (PICESS), a 10MWh lithium-ion phosphate battery storage system, has been proposed by AusNet Services and Mondo as a means to shore up electricity supply reliability for the Island – especially important during peak holiday periods and events like the Australian Motorcycle Grand Prix at the Phillip Island Circuit.

The developers also hope that the PICESS project will open up opportunities for greater renewable energy development on the Island, which is best known for hosting the largest Little Penguin colony in the world, providing the foundations for a future ecosystem of locally generated electricity.

“Mondo is excited to be supporting the co-design of the future of energy for the residents of Phillip Island and believe in the value of distributed energy resources …for customers and communities alike,” said Jodie Hallam, general manager of energy services at Mondo.

Mondo Power was spun out of AusNet as a fully independent subsidiary geared towards helping communities shift to locally sourced clean power. It has been working closely with Totally Renewable Yackandandah on that north-eastern Victorian town’s journey to 100 per cent renewables.

Backing the PICESS project is up to $55,000 in grants from the Victorian government through its Neighbourhood Battery Initiative grant program which will help fund feasibility studies and trials.

The first such grant will be used to fund the investigation and installation of up to ten street level low voltage batteries to further stabilise Phillip Island’s power and increase the electricity network’s capacity to host renewable energy sources.

The second funding grant will trial ways electricity tariffs can be used in combination with the PICESS to provide Phillip Island locals with “virtual battery storage”.

AusNet Services and Mondo will work together with local community groups Totally Renewable Phillip Island (TRPI) and the Energy Innovation Cooperative. The Bass Coast Shire Council will also work with Mondo to review suitable locations for the PICESS project.

“The announcement of this battery is thrilling for the member groups of Totally Renewable Phillip Island,” said Mary Whelan, Chair of TRPI.

“It is terrific to see our plans and targets take shape, and we are looking forward to cooperatively uncovering the ways the battery being introduced by AusNet and Mondo, can turbo charge our sprint toward 100% renewable energy.”

Filed Under: Battery/Storage, Other Renewables

Primary Sidebar

Sign up for our weekly newsletter

Emissions Counter

Renew Economy

RSS Energy News from Renew Economy

  • September was Australia’s second hottest on record, and second driest in the east, BoM data shows
  • Chart of the day: Ten years of diesel rebates almost pays for a new truck
  • Biggest wind farm in two years reaches financial close, the ninth in last 12 months, and a new big battery
  • Australian company behind home battery that Bowen bought enters administration, hit by flood of “cheaper” imports
  • Environmental approvals process kicks off for giant transmission line Coalition has vowed to scrap

RSS Electric Vehicle News from The Driven

  • Australian electric vehicle sales by month in 2026 – by model and by brand
  • Tesla sales come off the boil due to shipment dates, but Model 3 leaps ahead before release of cut-price model
  • Grid agency allows electric cars to send power back to the grid, but industry says the rules are still too complicated
  • Hyundai scraps Ioniq 3 Australia launch as small EV price war bites
  • Volkswagen to deliver electric Tiguan as part of EV rebranding plan

Press Releases

  • Huge luxury Saudi resort goes 100pct renewables with one of world’s biggest batteries
  • How solar + storage can be a game-changer for people with disabilities
  • Contact
  • Advertise with us
  • About One Step Off The Grid
  • Terms of Use
  • Privacy Policy

Footer

Technologies

  • Solar
  • Battery/Storage
  • Electric Vehicles
  • Energy Efficiency
  • Software/Gadgets
  • Other Renewables
  • Policy
  • Tariffs
  • Contact
  • Advertise with us
  • About One Step Off The Grid
  • Terms of Use
  • Privacy Policy

Copyright © 2026 · OneStep Genesis on Genesis Framework · WordPress · Log in