• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
One Step Off The Grid

One Step Off The Grid

Solar, storage and distributed energy news

  • Solar
  • Battery/Storage
  • Off-Grid
  • Efficiency
  • Software
  • Podcasts
  • Tariffs
  • Electric Vehicles
  • Electrification

Community wind farm in Bavaria

December 9, 2015 by Craig Morris Leave a Comment

Shuttershock

Renewables International

Bavaria has implemented draconian conditions for new wind farms. At Starnberger Lake, a mayor and his community have rushed to complete a wind farm before the new stipulations take effect. The story shows that not all Bavarians support their state government’s stance on wind power.

“The Energiewende is very, very important to us,” says Rupert Monn, mayor of the town of Berg. “But we don’t just want to talk; we also want to take action by generating electricity where it is consumed.”The new wind farm completed at the end of November is thus a call to action. The community owns 15 percent of the wind farm, and construction would soon not have been possible under the new rules for wind turbines, which now must be at least 10 times further away from the nearest buildings than the top blade tip. With modern wind turbines reaching 200 meters up, the distance would then be 2,000 meters – which practically rules out new projects in such a densely populated area. Even if the local people affected support the project.
Critics of the policy, like Monn, point out that the only space left is at the top of mountain ranges.

Shuttershock
Shuttershock

Locals got around this new policy requirement by getting their plans in before 1 August. The closest structure is only 1.25 kilometers from the nearest turbine. A vote in the local citizens council found widespread support for the project, with 20 yea votes and only two nay votes.
The wind farm is built in an area with wind velocities of 5.9 meters per second at hub height – moderate conditions common in southern Germany. The turbines are expected to run with a capacity factor above 26 percent, producing between 25 and 28 million kilowatt-hours annually.
Investors are municipalities and locals
169 stakeholders invested in the project, some 30 percent of them local citizens, with the rest being citizens from neighboring communities. The municipality also produced 15 percent of the equity (6.6 million euros) towards the total price tag of just over 21 million euros. The forest belongs to the state of Bavaria, which receives a lease. In addition to citizens from local communities, a nearby utility also invested. The wind farm consists of four turbines, and the project was developed by a local engineering firm.
Even though there was so much local involvement, protests came from many. “You will be able to see the turbines from the lake,” Monn says.  The area is a traditional tourist attraction, and some citizens were concerned about the wind farm’s impact on tourism. One group of citizens from Starnberg collected enough signatures to contest the project. But the citizens council demonstrated that it could not withdraw a valid permit. Protest also came from the neighboring town of Neufahrn.
Now, the investors are waiting for proof that the new project will not harm tourism. “Even in a special cultural landscape, it’s okay to see where the energy we consume comes from,” Monn says. He adds that the region not only lives off of tourism, but also from industry. “And wind power is important in that respect.”
Source: Renewables International. Reproduced with permission.

Filed Under: Other Renewables

Primary Sidebar

Sign up for our weekly newsletter

Emissions Counter

Renew Economy

RSS Energy News from Renew Economy

  • Another $5 billion tipped into Cheaper Home Batteries, but rebates slashed for bigger systems
  • Rooftop solar and batteries on centre stage: Six key graphs from AEMO’s transition roadmap
  • Will the lights go out if we don’t have baseload? “No, absolutely not,” say those whose job it is to keep them on
  • Energy Insiders Podcast: A blueprint to quit coal, and go green
  • Australia’s biggest aluminium smelter gets promise of cheaper, renewable power from feds and state

RSS Electric Vehicle News from The Driven

  • BYD Sealion 7 Premium review: The top-selling electric SUV that resets the standard
  • Tesla reveals over 10 billion km driven with FSD Supervised self-driving software
  • Zeekr delivers 1,000th unit of the highly popular 7X SUV, expands dealer network
  • Ultra-fast charging, kerbside charging and V2G projects share $21 million in Arena funding
  • Jet Charge and Ikea complete one of Australia’s biggest electric delivery vehicle charging networks

Press Releases

  • Huge luxury Saudi resort goes 100pct renewables with one of world’s biggest batteries
  • How solar + storage can be a game-changer for people with disabilities

Footer

Technologies

  • Solar
  • Battery/Storage
  • Electric Vehicles
  • Energy Efficiency
  • Software/Gadgets
  • Other Renewables
  • Policy
  • Tariffs
  • Contact
  • Advertise with us
  • About One Step Off The Grid
  • Terms of Use
  • Privacy Policy

Copyright © 2025 · OneStep Genesis on Genesis Framework · WordPress · Log in