• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
One Step Off The Grid

One Step Off The Grid

Solar, storage and distributed energy news

  • Solar
  • Battery/Storage
  • Off-Grid
  • Efficiency
  • Software
  • Podcasts
  • Tariffs
  • Electric Vehicles
  • Electrification

Australia's first "energy autonomous" medical centre built in Dorrigo

June 29, 2016 by Sophie Vorrath Leave a Comment

DCIM194MEDIA

A town in New South Wales’ Northern Tablelands is believed to boast Australia’s first “energy autonomous” medical centre, including a grid-connected solar and battery storage system.

DCIM194MEDIA
Image: Supplied

The Cork Trust memorial Medical Centre in Dorrigo was locally funded by the George and Annie Cork Memorial Trust and has been leased to Dorrigo Health and Wellbeing to provide the community with health services including general practitioners, pathology, podiatry, psychologists and visiting specialists.
Eventually the site will also include forty three independent housing units for seniors accommodation.
To power the medical centre, a 36kW grid-connected solar and storage system was designed and installed by local outfit Solar Depot Bellingen, made up of three Selectronic SP1202 inverter chargers, six ABB inverters, and Yingli polycrystalline solar panels.
Exterior night
The solar array is expected to be expanded to 90kW once all the stages of unit development have been completed.
The energy storage system is made up of OPzV gel lead acid batteries, which can store up to 72kWh of available electricity. This will be used to store excess solar production for use at night instead of selling it back to the grid at a low rate, and can also be used for back-up during blackout periods.
Energy room
The development’s “energy room”. Image: supplied

It is expected that the solar and storage system – when complete – will generate up to 20 per cent more power than the building’s average annual use.
The environmentally sustainable building, pictured above, was designed by Regional Architects and built by a local builder using local materials and trades wherever possible. It features cross ventilation, large thermal mass stores, double glazing, high rating insulation, natural lighting, low VOC paint, and a planted roof.
The medical centre will be kept warm through Dorrigo winters by a heat pump hydronic system, which is shared with the seniors housing development via an insulated underground hot
water loop.
A worm farm sewage system, storm water polishing, and a rain water harvested water supply completes the centre’s Autonomous Services Package.
“This iconic environmentally sustainable building is an example of the benefits of local knowledge and cutting edge technology which is able to provide environmental benefits and a fast return on investment for the trust,” said Geoff Tosio, Bellingen Solar Depot’s renewable energy consultant.

Sophie Vorrath
Sophie Vorrath

Sophie is editor of One Step Off The Grid and editor of its sister site, Renew Economy. Sophie has been writing about clean energy for more than a decade.

Filed Under: Battery/Storage, Energy Efficiency, Solar

Primary Sidebar

Sign up for our weekly newsletter

Emissions Counter

Renew Economy

RSS Energy News from Renew Economy

  • What fossil madness is this? Wars can’t interrupt flow of wind and the sun, but all we hear is drill, baby, drill
  • Can Australia make its own wind turbine parts? Global giant suggests it might be at the whim of federal LNP
  • Why some of Australia’s energy market conventions should go the way of the dinosaurs
  • In the case of critical minerals, China did not take our lunch – we left it on the table
  • Energy Insiders Podcast: Why batteries are the answer to nearly everything

RSS Electric Vehicle News from The Driven

  • Video: Have Chinese EVs already beaten Toyota in Australia?
  • BMW unveils i3 electric sedan, with 900 km of range
  • Bumpy path predicted for self-driving cars in Australia
  • Batteries, steel, aluminium: Polestar breaks down full carbon footprint of Polestar 5
  • Tesla to focus on more powerful 500 kW V4 cabinets for Supercharger network

Press Releases

  • Huge luxury Saudi resort goes 100pct renewables with one of world’s biggest batteries
  • How solar + storage can be a game-changer for people with disabilities

Footer

Technologies

  • Solar
  • Battery/Storage
  • Electric Vehicles
  • Energy Efficiency
  • Software/Gadgets
  • Other Renewables
  • Policy
  • Tariffs
  • Contact
  • Advertise with us
  • About One Step Off The Grid
  • Terms of Use
  • Privacy Policy

Copyright © 2026 · OneStep Genesis on Genesis Framework · WordPress · Log in