• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
One Step Off The Grid

One Step Off The Grid

Solar, storage and distributed energy news

  • Solar
  • Battery/Storage
  • Off-Grid
  • Efficiency
  • Software
  • Podcasts
  • Tariffs
  • Electric Vehicles
  • Electrification

Ausgrid to fast-track household solar and battery installs, cut costs by $200

July 28, 2016 by Sophie Vorrath Leave a Comment

NSW network operator Ausgrid says it intends to fast-track installation of residential energy saving technologies, making it cheaper and easier for households in the state to install solar and battery storage.
In a statement released on Wednesday, Ausgrid – which services almost 1.7 million customers in Sydney, the Central Coast and the Hunter region – said all solar and battery systems up to 30kW in size would be fast-tracked under the new plan, saving customers more than $200 on their applications.
rooftop-solar-panels-shutterstock_760px
The changes to the application process, due to be applied later this year, will remove the need for a more detailed technical assessment of systems of 5-10kW for single-phase connections and 15-30kW for three-phase connections.
Customers installing these systems will be able to fill out a single online form and will no longer need to pay a technical assessment fee.
Acting Ausgrid CEO Trevor Armstrong said customers wishing to upgrade their connection would also be able to apply using a single, online form.
“By cutting red tape, fees and processing times, we can help more homes and businesses across our network install solar and battery systems,” Armstrong said.
“This can also make the grid more efficient and help save all our customers long-term by reducing the need to build more capacity into the network.”
Armstrong said around 100,000 of the network’s customers had already installed embedded generation, usually residential rooftop photovoltaic systems.
“We get about 10,000 applications a year for embedded generation systems of up to 30kW,” he said.
“Up to one in 10 are for larger micro-generation systems, which previously required a more detailed technical assessment.
“We no longer see a need for this assessment based on the lower risk associated with these systems.
“This change will save these customers about $200 in fees per application and reduce processing times to about ten working days,” he said.

Sophie Vorrath
Sophie Vorrath

Sophie is editor of One Step Off The Grid and editor of its sister site, Renew Economy. Sophie has been writing about clean energy for more than a decade.

Filed Under: Battery/Storage, Solar

Primary Sidebar

Sign up for our weekly newsletter

Emissions Counter

Renew Economy

RSS Energy News from Renew Economy

  • More wind and batteries raise hopes for electricity bill cuts, but fossil fuel woes could still bite
  • Solar Insiders Podcast: How saving energy can save businesses a fortune
  • “The world is changing:” Regulator says consumers won’t be left holding bill for stranded gas networks
  • “Grow your own and buy local”: Networks seek change and flexibility to manage a 100 pct renewable grid
  • EPBC gives green tick to massive Queensland battery in just 41 days, now for the state

RSS Electric Vehicle News from The Driven

  • Tesla to focus on more powerful 500 kW V4 cabinets for Supercharger network
  • Global EV fleet avoided oil consumption equivalent to 70 pct of Iran’s exports in 2025
  • Suzuki e-Vitara first drive: An electric SUV with off-road cred
  • “We’ve listened”: Audi teases entry-level electric A2 e-tron
  • Australian company lands $158 million to build GPS alternative for self-driving cars

Press Releases

  • Huge luxury Saudi resort goes 100pct renewables with one of world’s biggest batteries
  • How solar + storage can be a game-changer for people with disabilities

Footer

Technologies

  • Solar
  • Battery/Storage
  • Electric Vehicles
  • Energy Efficiency
  • Software/Gadgets
  • Other Renewables
  • Policy
  • Tariffs
  • Contact
  • Advertise with us
  • About One Step Off The Grid
  • Terms of Use
  • Privacy Policy

Copyright © 2026 · OneStep Genesis on Genesis Framework · WordPress · Log in