• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
One Step Off The Grid

One Step Off The Grid

Solar, storage and distributed energy news

  • Solar
  • Battery/Storage
  • Off-Grid
  • Efficiency
  • Software
  • Podcasts
  • Tariffs
  • Electric Vehicles
  • Electrification

Solar powered water supply a step closer for Mt Isa

November 16, 2016 by Sophie Vorrath 1 Comment

A Queensland project that could deliver the state’s first solar-powered public water supply has come one step closer to fruition, after the successful completion of a pre-feasibility study.
State energy minister Mark Bailey said on Monday that the project, which will now progress to the design phase, would use renewable energy to increase the security of water supply to Mt Isa, a mining town in Queensland’s north west Gulf Country region.
media-release-miwb-dividends2-520x245
Mt Isa, while boasting a bountiful solar resource, has suffered extended drought conditions, which last year resulted in water supply being shut off to some local schools.
The solar project, which is being conducted by the Mount Isa Water Board will, is examining the use of cost-effective solar pumping to bring water from Lake Julius to the town’s water treatment plant.
Mt Isa’s water supply is usually sourced from just 13km away at Lake Moondarra. But in drought conditions, it can also be sourced from Lake Julius, which is 70km away.
Minister Bailey said the project had the potential to slash the “significant cost” associated with transporting water over that distance.
Mount Isa Water Board CEO Stephen Farrelly said the pre-feasibility study had indicated the project would be viable and generate a net cost saving for customers, but that there was still a lot of work to be done for it to be realised.
“The project is still in its infancy and, as is appropriate for such a substantial investment, it will need to progress through a series of approvals before a final investment decision can be made,” Mr Farrelly said.
Mount Isa mayor Joyce McCulloch said the project could have great benefits for the remote town.
“There is the obvious water security and reduced costs of pumping from Lake Julius, but it would also mean greater year-round recreation access for Lake Moondarra if the region can use water from Julius for a similar cost,” she said.
“North-west Queensland and Mount Isa have been identified as having one of the highest amounts of solar radiation per square metre, so it makes perfect sense for solar projects to be pursued.”
As reported on Energy Matters, another major Australian town already harnessing solar power to pump water is Broome in Western Australia, with a trial using hybrid solar-diesel and battery storage to pump drinking water from a borefield to Broome kicking off in August.
On a smaller scale, using solar to pump water for irrigation on farms is also taking off: “If a farmer has a requirement of reliable water supply, there’s no doubt in my mind that the economics of solar would stack up in each case,” Queensland-based solar installer Matthew Beech told One Step in September.
“A lot of the applications are going to be vertical bores, or transferring water from one damn to another.
“I can’t think of anything cheaper than filling one hole with water and being able to send it anywhere you like as long as the sun is shining. And with battery packs, you can take that to a 24 hour operation.”

Sophie Vorrath
Sophie Vorrath

Sophie is editor of One Step Off The Grid and editor of its sister site, Renew Economy. Sophie has been writing about clean energy for more than a decade.

Filed Under: Solar

Primary Sidebar

Sign up for our weekly newsletter

Emissions Counter

Renew Economy

RSS Energy News from Renew Economy

  • “Wandering towards dystopia”: CSIRO scientists want open discussion of climate impacts before it’s too late
  • Oil giant’s renewables arm co-launches equal biggest solar farm in Aotearoa NZ
  • Pacific island needs “radical adaptation” to survive climate change, as leader calls out “brutal” COP commentary
  • Laser tech could slash grid penalties for wind farms, because their forecasts are less wrong at the right times
  • Australia’s biggest wind projects stall as owners pass the hat around for billions of dollars in debt and equity

RSS Electric Vehicle News from The Driven

  • Mercedes unveils high performance, long range and high priced AMG GT SUV, which is heading to Australia
  • Plug-in hybrids emit almost as much CO2 as petrol and diesel cars, report finds
  • Chinese car maker Chery to launch new premium electric brand Exlantix in Australia in 2027
  • Oil, debt and the coming reset in car values – and what it means for EVs
  • Petrol retailer opens Australia’s biggest EV charging hub, but about to be trumped by a mega Tesla Supercharger site

Press Releases

  • Huge luxury Saudi resort goes 100pct renewables with one of world’s biggest batteries
  • How solar + storage can be a game-changer for people with disabilities
  • Contact
  • Advertise with us
  • About One Step Off The Grid
  • Terms of Use
  • Privacy Policy

Footer

Technologies

  • Solar
  • Battery/Storage
  • Electric Vehicles
  • Energy Efficiency
  • Software/Gadgets
  • Other Renewables
  • Policy
  • Tariffs
  • Contact
  • Advertise with us
  • About One Step Off The Grid
  • Terms of Use
  • Privacy Policy

Copyright © 2026 · OneStep Genesis on Genesis Framework · WordPress · Log in