• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
One Step Off The Grid

One Step Off The Grid

Solar, storage and distributed energy news

  • Solar
  • Battery/Storage
  • Off-Grid
  • Efficiency
  • Software
  • Podcasts
  • Tariffs
  • Electric Vehicles
  • Electrification

Mineral Resources to install big battery at Mt Marion lithium mine

December 19, 2018 by Giles Parkinson Leave a Comment

W.A.-based mining company Mineral Resources is installing a 3.288MWh battery at the Mt Marion lithium mine to eliminate the need for so-called “spinning reserve” that acts as back-up for its on-site gas generators.
The company expects to complete the installation of the ABB battery, using Samsung battery cells, in February.
The Mt Marion mine – said to have one of the biggest lithium reserves in the world – is located south-west of Kalgoorlie, and is jointly owned by Mineral Resources, Neometals and one of China’s largest lithium producer, Jiangxi Ganfeng Lithium.
Like the bigger battery that has operated at the Newman gas generator in the Pilbara, it is expected to deliver a quick pay-back on the investment.
Mining and other operators now find that using batteries significantly reduce the amount of fuel that is consumed by the need to have generators “spinning” on stand-by in case one of the large generators trips or a large load demand is requested.
Mineral Resources says it expects the battery at Mt Marion will help reduce emissions by around 1,504 tonnes a year due to the reduced burn of liquefied natural gas that needs to be trucked in for the 11MW gas plant.

Mineral Resources, which has also installed solar at its Perth headquarters, says it is looking at ways to use more batteries, more solar, and even hydrogen to reduce its dependence on LNG, which for the most part needs to be trucked in to remote sites at tremendous cost.
The company would not say how quick the pay-back would be on the battery, but said it was a “commercial” proposition.
Mineral Resources expects the battery will be discharging and recharging continually as it supplies power to the plant during spikes in the load demand as drives start up.
“It provides us power security should one of the online generators should trip, allowing enough time to bring a spare generator online, thus suppling a secure source of generating power,” a spokesperson said.
The Battery Energy Storage System (BESS) is rated at 2MW for 15 minutes for a full discharge.
 
 
 

Giles Parkinson
Giles Parkinson

Giles Parkinson is founder and editor of One Step Off The Grid, and also edits and founded Renew Economy and The Driven. He has been a journalist for 35 years and is a former business and deputy editor of the Australian Financial Review.

Filed Under: Battery/Storage

Primary Sidebar

Sign up for our weekly newsletter

Emissions Counter

Renew Economy

RSS Energy News from Renew Economy

  • Second stage of Supernode battery begins operations, making it the biggest in Australia’s main grid
  • Victoria is in a real energy pickle, and now has a new premier. One Nation is not the solution
  • GenCost: The seven caveats behind CSIRO’s “No Progress” scenario – and why it isn’t cheaper
  • Outrage machine winning as Australians worry that others don’t support energy transition
  • “Makes no sense:” Labor mulls third oil refinery as analysts urge faster push into EVs

RSS Electric Vehicle News from The Driven

  • Tesla Model Y six seater now available for immediate delivery in Australia
  • Volvo EX60 electric SUV gets sales approval with 2,400 kg towing ahead of imminent launch
  • Can Australia’s “little Norway” reach net zero by 2045? It will need very strong EV targets to get there
  • Video: Should Australia set an end date for selling ICE Cars?
  • Retail giant begins EV charger rollout at up to 30 store locations across Australia

Press Releases

  • Huge luxury Saudi resort goes 100pct renewables with one of world’s biggest batteries
  • How solar + storage can be a game-changer for people with disabilities

Footer

Technologies

  • Solar
  • Battery/Storage
  • Electric Vehicles
  • Energy Efficiency
  • Software/Gadgets
  • Other Renewables
  • Policy
  • Tariffs
  • Contact
  • Advertise with us
  • About One Step Off The Grid
  • Terms of Use
  • Privacy Policy

Copyright © 2026 · OneStep Genesis on Genesis Framework · WordPress · Log in