• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
One Step Off The Grid

One Step Off The Grid

Solar, storage and distributed energy news

  • Solar
  • Battery/Storage
  • Off-Grid
  • Efficiency
  • Software
  • Podcasts
  • Tariffs
  • Electric Vehicles
  • Electrification

Australia Post installs huge 2.1MW rooftop solar array in Sydney

December 20, 2017 by Sophie Vorrath 1 Comment

Australia Post has completed a 2.1MW rooftop solar installation at the Sydney Parcel Facility in Chullora, a project spanning over 11,000 square meters.

Australia Post has announced its latest commercial solar investment, this time with a massive installation of more than 2MW of rooftop PV on its Sydney parcel facility in Chullora.
The 2.1MW project – one of the biggest single rooftop arrays in the country – was completed last month, and is expected to go live by the end of the year, when it will start saving Australia Post more than $800,000 a year in energy costs.
The $3 million project notches up the organisation’s 49th solar-equipped site, which will soon generate a combined total of 5,000MWh (5GWh) of renewable electricity a year.
Australia Post Group Chief Financial Officer, Janelle Hopkins, said on Monday that the solar panels would directly power the country’s busiest parcel sorting centre.
“The solar power installation will reduce our operational costs, enabling us to invest more in the products and services our customers want from Australia Post.
“Our investments in improving energy and cost efficiency of our buildings have already saved us $40 million,” she said.
“This project is a strong example of our commitment towards leading with environmentally sustainable business outcomes.”
As noted above, at 2.1MW, the Chullora installation ranks among the biggest single rooftop solar installations in Australia so far, alongside the 1.9MW array that is currently being installed on the roof of the International Terminal at Queensland’s Brisbane Airport – part of a total 6MW airport-wide system.

Sophie Vorrath
Sophie Vorrath

Sophie is editor of One Step Off The Grid and editor of its sister site, Renew Economy. Sophie has been writing about clean energy for more than a decade.

Filed Under: Solar

Primary Sidebar

Sign up for our weekly newsletter

Emissions Counter

Renew Economy

RSS Energy News from Renew Economy

  • World’s largest compressed air energy storage facility goes online in China salt caverns
  • Can Australian-made solar wafers compete with Chinese giants? This report suggests they can
  • Tesla unveils its newest energy product – a rooftop solar panel
  • Hybrid solar and eight-hour battery facility with “EV servo” gets federal green light
  • Renewables certificate prices hit new low in response to demand that “just isn’t there”

RSS Electric Vehicle News from The Driven

  • Polestar 2 refresh: Useful tweaks to a “driver’s car” without the bings and bongs
  • First look under the hood of the Tesla Cybercab ahead of official production
  • Australian state opens its first overhead gantry-charged bus depot
  • CEFC provides $60m to help Hyundai and Kia offer discounted financing to EV buyers
  • BYD slashes drive-away prices on its best-selling EV in Australia

Press Releases

  • Huge luxury Saudi resort goes 100pct renewables with one of world’s biggest batteries
  • How solar + storage can be a game-changer for people with disabilities

Footer

Technologies

  • Solar
  • Battery/Storage
  • Electric Vehicles
  • Energy Efficiency
  • Software/Gadgets
  • Other Renewables
  • Policy
  • Tariffs
  • Contact
  • Advertise with us
  • About One Step Off The Grid
  • Terms of Use
  • Privacy Policy

Copyright © 2026 · OneStep Genesis on Genesis Framework · WordPress · Log in