• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
One Step Off The Grid

One Step Off The Grid

Solar, storage and distributed energy news

  • Solar
  • Battery/Storage
  • Off-Grid
  • Efficiency
  • Software
  • Podcasts
  • Tariffs
  • Electric Vehicles
  • Electrification

How an outback town proposes to switch off fossil fuels

March 31, 2015 by Giles Parkinson Leave a Comment

oober-pedy-town
The outback town Coober Pedy in remote South Australia will be able to turn off its fossil fuel generators for at least half of the year under a proposed solar-wind-battery hybrid model to be built by the town’s main electricity supplier.
Coober Pedy – known as the Opal Capital of Australia – was last year named as the site for the solar-wind hybrid installation that Energy Developments says could be the template for off-site generation elsewhere in Australia, and indeed elsewhere around the world.
Energy Developments, the largest operator of off-grid installations in Australia, currently uses little or no wind or solar. But at Coober Pedy, under a program sponsored by the Australian Renewable Energy Agency, it will install 3MW of wind power, 2MW of solar, and 1MW/250kWh of battery storage.
Energy Developments says this will likely reduce diesel consumption by 70 per cent, and could mean that the 3.9MW diesel generators currently powering the town can be switched off more than 50 per cent of the time. The town has a peak demand of around 3MW peak and an average load of around 1.5MW.
A typical day’s generation – with wind and solar – may look something like this ….
coober Pedy
Energy Developments says that wind and solar are complimentary, with wind blowing most at night, and solar –  of course- producing during the day. It says it envisages whole days when the diesel generators are not used at all.
This will echo the experience of Hydro Tasmania, which has introduced a solar-wind-storage hybrid on King Island, and is also proposing to do the same on Flinders Island. Hydro Tasmania is helping design the project
Energy Developments will call for tenders for suppliers this month, and expects construction to begin in October. It says that it expects the modularised design is scaleable both up and down for different applications.
Originally published on RenewEconomy.

Giles Parkinson
Giles Parkinson

Giles Parkinson is founder and editor of One Step Off The Grid, and also edits and founded Renew Economy and The Driven. He has been a journalist for 35 years and is a former business and deputy editor of the Australian Financial Review.

Filed Under: Battery/Storage, Solar

Primary Sidebar

Sign up for our weekly newsletter

Emissions Counter

Renew Economy

RSS Energy News from Renew Economy

  • Balcony solar is powering apartments from Berlin to Barcelona. So why not in Australia?
  • “Appetite for risk:” Net Zero Fund to offer super-cheap loans for industrial decarbonisation
  • Giant Pilbara wind, solar and hydrogen hub dumped by bp wins $21 million government grant
  • Wind and solar curtailment: Beneath the headline numbers from 2025
  • Webinar: Energy Trends 2026 – Caught in the crosswinds

RSS Electric Vehicle News from The Driven

  • Waymo raises $A23 billion to scale global presence for autonomous vehicles
  • Fortescue to take delivery of first massive battery electric trucks from China supplier
  • Australian electric vehicle sales by month in 2026 – by model and by brand
  • BYD, Zeekr and Geely take top spots in EV sales, as Tesla slump heralds changing of guard
  • Tesla sales in January dip despite multiple incentives

Press Releases

  • Huge luxury Saudi resort goes 100pct renewables with one of world’s biggest batteries
  • How solar + storage can be a game-changer for people with disabilities

Footer

Technologies

  • Solar
  • Battery/Storage
  • Electric Vehicles
  • Energy Efficiency
  • Software/Gadgets
  • Other Renewables
  • Policy
  • Tariffs
  • Contact
  • Advertise with us
  • About One Step Off The Grid
  • Terms of Use
  • Privacy Policy

Copyright © 2026 · OneStep Genesis on Genesis Framework · WordPress · Log in