• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
One Step Off The Grid

One Step Off The Grid

Solar, storage and distributed energy news

  • Solar
  • Battery/Storage
  • Off-Grid
  • Efficiency
  • Software
  • Podcasts
  • Tariffs
  • Electric Vehicles
  • Electrification

New home battery? Great! Now switch it off until July

April 14, 2025 by Finn Peacock Leave a Comment

Image: Solar Edge

Batteries are still expensive, and for many solar owners they remain just out of reach. So a rebate of $3,700 off a 10 kWh battery, administered through the existing Small-scale Renewable Energy Scheme (SRES), is exactly what’s needed to get them over the line.

Using the SRES framework means the rollout can be fast, with minimal bureaucracy. It’s also retroactive — so if you install a battery between now and July 1, and Labor is re-elected, you’ll still be eligible for the rebate.

That retroactivity should soften the usual effect of everyone freezing their wallets for three months while they wait for a rebate to kick in.

Should.

In reality, most people will still wait. They don’t want to cashflow thousands of dollars for a rebate that isn’t locked in. And they definitely don’t want to risk missing out over some technicality in the paperwork. So while the intent is good, the market will likely stall anyway.

A battery you aren’t allowed to use

There was, however, one takeaway from an industry briefing that really made my jaw drop: batteries installed from now to July 1 will also be eligible (assuming Labor is returned to power), but cannot be switched on until July 1.

Sorry – what?

You can pay for a battery. You can get it installed. You can have it wired up to your switchboard. You can connect it to the grid. But you’re not allowed to switch it on?

That’s not just bureaucratic overreach. It’s actively stupid.

The entire point of this rebate is to help households save money and support the grid. So the faster batteries are installed and operating, the better. Why make people wait? What possible good is served by forcing energy storage systems to sit idle for three months?

It’s a classic example of process trumping reality. Some legal or political technicality, probably dreamed up in a Canberra meeting room, has ended up overriding basic common sense. If the paperwork’s not final, fine. But let people use the gear they’ve paid for.

This article was originally published on Solar Quotes. Reproduced here with permission. Read the original version here.

Filed Under: Battery/Storage, Policy

Primary Sidebar

Sign up for our weekly newsletter

Emissions Counter

Renew Economy

RSS Energy News from Renew Economy

  • “It’s time to switch it on:” How to unlock a commercial rooftop PV power station equal to 10 coal plants
  • Green bank targets small solar hybrids and battery retrofits in new $100 million package as mega projects stall
  • Energy Insiders Podcast: A battery with every wind turbine
  • Origin reports big dip in gas sales, as demand falls and batteries grab more of energy mix
  • Two coal state energy ministers come face to face and present wildly different visions of the future

RSS Electric Vehicle News from The Driven

  • MG offers discounts and accessories on its premium EVs
  • BYD slashes price of Sealion 7 premium model as it chases down Toyota to be country’s best selling car company
  • Geely offers free charger and low finance incentive on new EX2 electric hatch
  • “Extraordinary moment:” World’s largest electric ferry, made in Australia, loaded on cargo ship for trip to South America
  • Tesla produces its 10 millionth EV, six years after making its first million

Press Releases

  • Huge luxury Saudi resort goes 100pct renewables with one of world’s biggest batteries
  • How solar + storage can be a game-changer for people with disabilities

Footer

Technologies

  • Solar
  • Battery/Storage
  • Electric Vehicles
  • Energy Efficiency
  • Software/Gadgets
  • Other Renewables
  • Policy
  • Tariffs
  • Contact
  • Advertise with us
  • About One Step Off The Grid
  • Terms of Use
  • Privacy Policy

Copyright © 2026 · OneStep Genesis on Genesis Framework · WordPress · Log in